Harmonic Filtering & Power Quality Stabilization Project

Supply & Installation of Equipment for SVG Project

04 × 32 Mvar22 kV
50 Mvarper operating cluster
30 + 20 MvarSVG fast control + filter branches
22 kVbusbar · 110 kV connection
Induction furnacecluster & non-linear loads
Challenge

Anh Minh participated in developing a dynamic reactive power compensation solution for the Induction Furnace cluster and non-linear loads, where low cosφ, voltage fluctuation/flicker, harmonics, and unbalance often occur on the 22kV busbar (110kV connection point).

Solution

The proposed plan configures 50 Mvar for each operating cluster (comprising 30 Mvar SVG fast control and 20 Mvar multi-stage harmonic filter capacitor branches), simulated to avoid resonance and ensure safe operation according to IEC.

Integration

The system integrates redundant control-protection, HMI/SCADA, de-ionized water cooling, accompanied by installation supervision, commissioning, training, and document handover services—helping to stabilize voltage and reduce the risk of line stoppages.

Redundant control-protectionHMI / SCADADe-ionized water cooling
Scope of work
  • Installation supervision
  • Commissioning
  • Training
  • Document handover